Warehouse Relocation Services in Davie, FL
Moving a equestrian and agricultural supply operation in Davie means downtime costs real money every day the rack is not standing. The new building near Griffin Road corridor has different columns, clear height, and docks, so the old layout will not just drop in. Davie's industrial product around the Airpark and Griffin Road keeps opening up new flex and industrial space that has to be racked when tenants take possession.
We handle the storage side of a Davie warehouse relocation: labeled teardown, transport coordination, reinstallation to a new CAD layout, and new rack where the new building needs it. Call (954) 440-7435 and tell us your move date.
Why Davie Businesses Pick Us for Warehouse Moves
Industrial space around Davie Industrial Airpark, Griffin Road corridor, and SW 30th Avenue turns over constantly, and the buildings vary a lot. A move from an older Davie Industrial Airpark building into newer tilt-wall space usually means more clear height and a different column grid — which is a chance to gain positions, not just copy the old layout.
We have planned rack moves for equestrian and agricultural supply and healthcare distribution operations across Broward County as part of Warehouse Equipment & Supplies Co. since 1997. That history helps us plan rack configurations around actual pallet weights, dock access and the clear height available in the new building.
You also get one point of contact in Davie from the first walk-through to the last capacity tag — the same team that tore the rack down answers the phone when you need to add a bay next year.
Industries We Move in Davie


How a Davie Warehouse Relocation Works
Six steps, one team, and a drawing for the new building before anything comes down.
Walk-through and inventory
We document every frame, beam, deck, and accessory in the current building, note damage, and record beam elevations so nothing gets guessed at the new site.
Layout for the new building
Our design team draws a CAD layout of the new space around its columns, clear height, and docks — then shows where existing rack fits and where new rack is needed.
Labeled teardown
Experienced installation crews we schedule and manage take the rack down bay by bay, tagging and bundling components by row so reinstallation follows the drawing instead of a pile of steel.
Transport coordination
We schedule trucks and staging around both buildings' dock hours, so rack arrives at the new site in the order it goes up.
Reinstallation and add-ons
Rack is anchored to the floor, plumbed, leveled, and capacity-tagged in the new building, with new frames, beams, or decking added wherever the layout calls for them.
Layout and load ratings
We provide the approved layout and load ratings for the reinstalled configuration, so your team has documented capacities for every row.
What Our Davie Warehouse Moving Services Include
A Davie warehouse relocation starts with two walk-throughs: the building you are leaving and the one you are moving into. We inventory the rack you have — frames, beams, decking, accessories — note damage, and measure the new space for clear height, column spacing, and docks.
From there our design team draws a CAD layout for the new Davie building. It shows which existing rack goes where, what new components are needed to use the extra height or fill gaps, and where aisles land for your lift trucks. You get an itemized quote that separates teardown, transport, reinstallation, and new material.
On move week, experienced installation crews we schedule and manage tear the rack down bay by bay, labeling and bundling by row. We coordinate trucks around both buildings' dock hours so steel arrives in the order it goes back up. Reinstallation follows the drawing: anchored to the floor, plumbed, leveled, and capacity-tagged, with documented load ratings for the new configuration. The move is phased so your Davie team can start receiving in finished zones while the rest is still going up.
Recent Rack Installations
Rack systems we have installed and reinstalled across South Florida.










Get a Warehouse Relocation Quote in Davie
Tell us where you are moving from, where you are moving to, and your move date. Prefer to talk? Call (954) 440-7435.
Fort Lauderdale Pallet Rack
2831 E Oakland Park Blvd.
Ste 9 #3144
Fort Lauderdale, FL 33306
(954) 440-7435Monday - Friday: 8:00 AM - 6:00 PM
Davie Warehouse Relocation FAQs
Adding Rack in Your New Davie Building?

Pallet Rack in Davie
Every pallet reachable, every time. The baseline we size everything else against.

Pushback Rack in Davie
Two to six pallets deep from one aisle, without giving up much reach.

Pallet Flow Rack in Davie
Load one side, pick the other, and let gravity enforce first in, first out.

Drive-In Rack in Davie
No aisles. The forklift enters the structure, and the floor holds more pallets per square foot than any other system.

Cantilever Rack in Davie
Arms with nothing in front of them, built for lumber, pipe, and anything a pallet can't hold.

Carton Flow Rack in Davie
Cases advance to the picker instead of the picker hunting for cases.
Warehouse Relocation Near Davie
We move and reinstall warehouse rack across Broward, Miami-Dade, and Palm Beach counties.
Where We Work
Located in Fort Lauderdale, we serve all of South Florida with industrial pallet racks and warehouse storage solutions.
Fort Lauderdale Pallet Rack
Address
2831 E Oakland Park Blvd.
Ste 9 #3144
Fort Lauderdale, FL 33306
Phone
(954) 440-7435Business Hours
Monday - Friday: 8:00 AM - 6:00 PM
Saturday: Closed
Sunday: Closed
Moving Your Davie Warehouse?
Call (954) 440-7435 or request a quote and we will start the layout for your new building.